One of our fitters will attend site at a pre-arranged date and time and will carry out the template of the worktops or splashbacks. The template can be carried out using cordex plastic or our digital Faro template machine.
All areas to which stone is to be installed should be ready and in final position prior to templating.
Please ensure all units and appliances are:
- Level
- Fixed Together
- Secured to wall or floor
- Plastered (walls)
All existing worktops whether temporary or otherwise, should be removed.
In addition, all existing sinks, taps and hobs should be removed.